| |
The Spring of 2010 finally saw the planned renovations
at the parish buildings begin. Work includes the creation of a day chapel, the covering over of the
central courtyard as well as breaking out of two of the side walls thus creating a large atrium. An
apartment is being created on the top floor and a whole range of meeting spaces are being made on the
middle floor. The ground floor will house the secretariat and the Pastor's study. A semi-professional
kitchen is being built with direct hatches through to the atrium and the existing parish hall is being
overhauled and renewed with a proper bar space and new furniture.
We finally got some photos of the work to be able to show you.
|
|